steel pipe

Overview Of Groove Connections

  • Monday, 24 March 2025
  • 0
  • 686
  • 0

  1. Groove machining

  2.  1) Check the size, roundness and manufacturing quality of the nozzle to meet the requirements of groove production;
    • 2) Process the groove in different stages according to the specified time and measure the depth and other dimensions of the groove again;
    • 3) The groove processing shall not damage the galvanized layer and internal coating of the pipe.
    •  
    • Groove assembly
    • 1) Clean the pipe end, cover the rubber sealing ring, mount the clamp and tighten the bolt;
    • 2) The center line of the pipeline at the two ends of the groove is consistent, and the installation direction of the groove (position of fastening bolts) is consistent;
    • 3) Rigid joints should be adopted in the straight pipe segment. A flexible joint should be arranged between every 4-5 continuous rigid joints on the pipe segment.
    •  

Overview Of Groove Connections

Overview Of Groove Connections

Overview Of Groove Connections

My company hot sale steel pipe:

 ASTM A106 B seamless pipes,(1” to 24” sch40, sch80),

API 5L GR.B steel pipes, Boiler tubes,( 20G. 12Cr1MoVG, ASTM A335 P5, P9, P11),

ASTM A333 GR.6 seamless pipes, ( 1” to 24” sch40, sch80, sch160)

0users like this.

Leave a Reply

RSS

Get in touch

Refresh Code