steel pipe
Overview Of Groove Connections
- Groove machining
1) Check the size, roundness and manufacturing quality of the nozzle to meet the requirements of groove production;- 2) Process the groove in different stages according to the specified time and measure the depth and other dimensions of the groove again;
- 3) The groove processing shall not damage the galvanized layer and internal coating of the pipe.
- Groove assembly
- 1) Clean the pipe end, cover the rubber sealing ring, mount the clamp and tighten the bolt;
- 2) The center line of the pipeline at the two ends of the groove is consistent, and the installation direction of the groove (position of fastening bolts) is consistent;
- 3) Rigid joints should be adopted in the straight pipe segment. A flexible joint should be arranged between every 4-5 continuous rigid joints on the pipe segment.



My company hot sale steel pipe:
ASTM A106 B seamless pipes,(1” to 24” sch40, sch80),
API 5L GR.B steel pipes, Boiler tubes,( 20G. 12Cr1MoVG, ASTM A335 P5, P9, P11),
ASTM A333 GR.6 seamless pipes, ( 1” to 24” sch40, sch80, sch160)
0users like this.