steel pipe

Pipeline Flange Connection Overview

  • Tuesday, 24 December 2024
  • 0
  • 618
  • 0


1) The matching flange specifications and models are the same; When connecting with the flange of the equipment, it shall be matched according to its specifications.

2) When the flange is connected, it is coaxial and parallel, and the flange surface is perpendicular to the center of the pipe;

3) The fastening bolts shall have the same specifications and the same direction, and the exposed length of the bolts shall be 1/2 bolt diameter or flush with the nuts;

4) Put the nut on the valve piece side when connecting the valve;

5) Keep the top two screw holes of the horizontal pipe flange parallel to the wall with the horizontal and vertical pipe flange against the wall.

Chinese flange standard: national standard GB9112-9123, ministry of machinery standard JB79-86, ministry of chemical industry standard HG5008-5028 and ministry of petroleum industry standard SYJ4, flange bolt hole center is the same, JB standard and HG standard pipe diameter for "small outside diameter", GB standard and SYJ standard for "big outside diameter", when using should pay attention to the flange bolt hole number of individual specifications different statement

Pipeline Flange Connection Overview

20191102172441_19961

0users like this.

Leave a Reply

RSS

Get in touch

Refresh Code